Network News

Viking Project Logistics has completed the Shanghai – Konya project!

8:48am 18th September 2020

SHARE THIS ARTICLE

Facebook

Twitter

LinkedIn

In collaboration with their good partner Sino Projects, Viking Project Logistics

has completed the shipment of another project with a packing list of 1.500 CBM in total. The pieces were mostly steel structures, roller and rotors. The team's responsibility was from Shanghai Port to the final delivery address which was Konya, Turkey via Sanko Port, Adana, Turkey. With the assistance of their partner, they have loaded the cargo in Shanghai port onto breakbulk vessel to sail for delivery to Sanko Port.

Viking Project Logistics team, itself were at Sanko Port, Adana to supervise and control the unloading and transshipment of the cargo from breakbulk vessel to their trucks. During the operation they were always at the port taking care of the cargo and handling the operation, from beginning to end. They have done the shipment of 48 pieces with 27 trucks. The temperature of Adana was a big challenge for them as it was almost 53 Celsius every day while the project lasted. In total the discharging operation took 6 days. At the end, all of the goods were safely delivered to Konya, Turkey.

Bravo to the Viking Project Logistics for successfully handing this BB shipment, with efficiency and professionalism. Contact the team if you need any support to/from Turkey! 
Visit their members profile: 
https://www.x2projects.com/member_profile?id=11244

NEW YORK

SAO PAULO

LONDON

DUBAI

BANGKOK

HONG KONG

TOKYO

SYDNEY

OUR PARTNERS